Optimal scheduling of a grid-connected hydrokinetic-battery system under Time of Use tariff
1994 ◽
Vol 52
◽
pp. 430-431
Keyword(s):
2014 ◽
Vol 134
(11)
◽
pp. 740-741
1966 ◽
2019 ◽
Vol 12
(4)
◽
pp. 30
2019 ◽
Vol 8
(1.6)
◽
pp. 219-224