MHS conformance testing experiences in designing a test suite (message handling)

Author(s):  
W. Lange
2014 ◽  
Vol 543-547 ◽  
pp. 2893-2896
Author(s):  
Fa Tang Chen ◽  
Na Na Han

This paper focuses on the terminal RRC connection establishment procedure, designs its message sequence chart (MSC), then write abstract test suits in TTCN-3 core language on TTworkbench test platform, generate GFT figure and compare it with the protocol specification, and complete conformance testing of RRC connection establishment procedure. At present, this scheme has been effectively verified in the project of TD-LTE TTCN extended test suite instrument development.


Sign in / Sign up

Export Citation Format

Share Document