Cost Model Based on Software-Process and Process Oriented Cost System

Author(s):  
HongTao Chen ◽  
Jun Liu ◽  
ShengMing Gu
Author(s):  
Peter Killisperger ◽  
Markus Stumptner ◽  
Georg Peters ◽  
Georg Grossmann ◽  
Thomas Stückl

2021 ◽  
Vol 2078 (1) ◽  
pp. 012019
Author(s):  
Gonghan Liu ◽  
Yue Li ◽  
Xiaoling Wang

Abstract If the traditional deep learning framework needs to support a new operator, it usually needs to be highly optimized by experts or hardware vendors to be usable in practice, which is inefficient. The deep learning compiler has proved to be an effective solution to this problem, but it still suffers from unbearably long overall optimization time. In this paper, aiming at the XGBoost cost model in Ansor, we train a cost model based on LightGBM algorithm, which accelerates the optimization time without compromising the accuracy. Experimentation with real hardware shows that our algorithm provides 1.8× speed up in optimization over XGBoost, while also improving inference time of the deep networks by 6.1 %.


2018 ◽  
Vol 4 (2) ◽  
pp. 51-62
Author(s):  
L.O. Rodríguez Manay ◽  
I. Guaita ◽  
I. Marqués

Research has been presented on the application of activity-based cost (ABC) in the manufacturing and service industries in the agricultural sector, which examines recent advances in cost accounting methods with special reference to the application of cost based in methodological activities in the primary sector. Accordingly, this document proposes using a transparent, flexible, easy to apply and understand cost model; based on activities to calculate and manage production costs in companies.


2019 ◽  
Vol 118 ◽  
pp. 02053
Author(s):  
Boyang Cao ◽  
Yi Ren ◽  
Yaping Wang ◽  
Weining Wen ◽  
Huijun Sun ◽  
...  

Based on the analysis of traditional state maintenance strategy and big data-based state maintenance strategy, this paper builds a transformer state duration simulation model based on Monte Carlo method and builds an annual cost model based on the running state of the transformer. Finally, a typical case is selected to simulate a time series of 8760 hours of transformer operation under two operational inspection strategies, and the annual cost is calculated separately. The example shows that the annual cost of the transformer is lower under the big data-based inspection strategy.


Sign in / Sign up

Export Citation Format

Share Document