Fuzzy comprehensive evaluation research on the industrial emission of Guizhou

Author(s):  
Jianying Chen ◽  
Honglei Wang
2011 ◽  
Vol 301-303 ◽  
pp. 811-816
Author(s):  
Yong Luo ◽  
Xiu Chun Guo

With the development of the transportation, the county-country highway network has the more and more important function in the transportation network. Therefore, it is necessary to establish the scientific method evaluating the total function of the county country road network, so as to support decision for the synthetically transportation planning and management. The paper evaluates the whole construction level, layout quality and total capacity of the county-country highway network from the standpoint of holistic planning and synthetically transportation development. The status of the existent network is investigated and analyzed. Then the corresponding evaluating guideline system and method is put forward. Applying the proposed system and method, the paper analyzes the performance of some county highway network in Nanchong city and brings forward some improvement suggestions.


2012 ◽  
Vol 174-177 ◽  
pp. 3328-3333
Author(s):  
Chao Wang ◽  
Hai Bin Ma ◽  
Chuan Qin Yao

The critical condition evaluation of BT mode is adopted to balance rights and benefits between government and investor. This paper aims to describe and analyze repurchasing radix design, yield design, and repurchasing mode design. Apply the fuzzy comprehensive evaluation to set the evaluation model, which includes 8 valuables factors reflected in the evaluation, and do the preliminary empirical research of the model and get the primary weighing of the 8 factors through the empirical research. By calculating and analyzing, the model truly reflects the interest relation between the government and the investor. Using this model, theoretical foundation to BT mode decision-negotiation is offered.


2014 ◽  
Vol 488-489 ◽  
pp. 437-440
Author(s):  
Wen Dong Ma ◽  
Xiao Guang Wu ◽  
Heng Da Chen

Using the fuzzy evaluation theory,through the establishment of the safety of large cross construction of fuzzy evaluation model, using AHP to evaluate the safety of large cross construction, the comprehensive safety evaluation,and points out its advantages and disadvantages. The fuzzy control is conducive to the management level of large-scale cross constructionsafety improve, to the great guidance for other types ofcity rail traffic.


2013 ◽  
Vol 834-836 ◽  
pp. 1972-1975
Author(s):  
Jia Juan Chen ◽  
Yong Xin Zhang ◽  
Ting Ting Huang

According to the reality of the railway oil supply chain, this paper proposes a BSC-SCOR model in five-dimension to overcome the shortcomings of the traditional BSC model, and establishes a more objective and comprehensive supply chain performance evaluation indicator system. This research uses AHP method, integration algorithm and fuzzy comprehensive evaluation to calculate the performance of the railway oil supply chain.


Sign in / Sign up

Export Citation Format

Share Document