Improving the performance of Earned Value Analysis as a construction project management tool

2000 ◽  
Vol 7 (4) ◽  
pp. 399-411 ◽  
Author(s):  
RODNEY HOWES
2011 ◽  
Vol 17 (3) ◽  
pp. 445-455 ◽  
Author(s):  
Hamzah Abdul-Rahman ◽  
Chen Wang ◽  
Norjuma’ah Binti Muhammad

Earned value analysis (EVA) is a well-known project management tool for monitoring and forecasting the project performance such as time and cost. Despite the benefits found in the manufacturing industry, EVA has not been widely implemented in the Malaysian construction industry. This study is aimed to determine the advantages of EVA over other project control methods, to determine the suitability of implementing EVA in construction projects, and to develop a working flowchart as a guide in implementing EVA. Accordingly, qualitative approaches including the structured interview survey and the flowchart development were employed in this study. Findings reveal that comparing to stochastic methods, Fuzzy logic model, and miscellaneous methods, the EVA has remarkable advantages in accuracy, flexibility, and adaptability for complexity. Malaysian government has decided to implement EVA to enhance the level of project management for the whole country. Hence, an EVA working flowchart was developed by the authors, through which more de- tailed project status could be monitored and more accurate future performance of the project could be forecasted. Santrauka Uždirbtos vertės analizė (UVA, angl. Earned Value Analysis, EVA) – paplitęs projektų valdymo įrankis, skirtas projekto efektyvumui, pavyzdžiui, laikui ir sąnaudoms, stebėti ir prognozuoti. Nors UVA nauda gamybos sektoriuje akivaizdi, Malaizijos statybų sektoriuje ji nėra plačiai taikoma. Šiuo tyrimu siekiama nustatyti UVA pranašumus prieš kitus projektų kontrolės metodus, nustatyti UVA tinkamumą statybų projektams ir sukurti darbinę srautų diagramą, kuri padėtų diegiant UVA. Taigi tyrime taikyti kokybiniai metodai, įskaitant apklausą, naudojant nustatytos struktūros pokalbius, ir srautų diagramos kūrimą. Išvados rodo, kad tikslumu, lankstumu ir pritaikymu sudėtingiems atvejams UVA yra gerokai prana- šesnė už stochastinius metodus, neraiškiosios logikos modelį ir įvairius kitus metodus. Malaizijos Vyriausybė nutarė įdiegti UVA, taip pagerindama projektų valdymą visoje šalyje. Dėl to autoriai sukūrė darbinę UVA srautų diagramą, kuri leidžia stebėti smulkesnius projekto būsenos aspektus ir tiksliau prognozuoti projekto efektyvumą ateityje.


Author(s):  
Fatemeh Nouban ◽  
Nour Alijl ◽  
Mohammad Tawalbeh

The project management system has many tools and techniques to control projects' main elements schedule, cost, quality, risk, communications and procurements to attain project success and high performance. Earned value analysis (EVA) is the most effective tool to measure project performance which is widely used by many organisations such as Defence Acquisition University; National Aeronautics and Space Administration; Society of Cost Estimates and Analysis; and Project Management Institute (PMI)  to measure project performance and control it through cost and schedule,  which are illustrated into graphs to forecast the project results to be shared and reported to top management, stakeholders and client in regular basis taking into consideration the other factors such as risk management, project environment, quality, safety, control charts, and sustainability to attain highly performance. Proposed methodology in the presented paper to implement the integrated EVA in an effective and uncomplicated way to attain project success and high performance using an automated sheet to perform analysis for an anonymous hospital design project with the total duration of seven months and illustrates and summarises the key factors based on previous studies and project examples.


Neutron ◽  
2021 ◽  
Vol 21 (1) ◽  
pp. 20-26
Author(s):  
Mohammad Irfandio Kurniawan ◽  
Diah Ayu Restuti Wulandari ◽  
Diah Ayu Restuti Wulandari ◽  
Julistyana Tistogondo ◽  
Julistyana Tistogondo

Project development and how to control time and costs in the construction project of a public junior high school 1 Surabaya. This research was conducted with the aim of knowing and comparing the amount of duration and cost after acceleration by using the alternative Earned Value Analysis. The case study in this research takes the construction project of a public junior high school 1 Surabaya which is located in Surabaya. The data needed in this study include the S curve, recapitulation of project cost calculations, a list of budget plans (RAB), and a list of unit wage prices for workers. The research method used is to design network planning, calculate the cost variance and variance schedule for each activity that changes due to changes in the duration of implementation, acceleration of work duration, and determination of the optimum cost and duration due to the application of the Earned Value Analysis method. For the calculation of the variance Schedule on week 34 shows a positive result of Rp. 109,550,470. For the calculation of the cost variance from week 34 shows - Rp. 2,488,159. For the calculation of Estimate at completion (EAC) on week 34 of Rp. 6,663,998,229. For the calculation of Estimate temporary schedule, the evaluation week 34 experienced a delay of 53 days from the original schedule. So the work completion time is 233 calendar days


2020 ◽  
Vol 3 (1) ◽  
pp. 31
Author(s):  
Dedy Asmaroni ◽  
Aldi Setiawan

In a construction project there are various stages related to construction management, in which there are various problems regarding the management of costs and time off work so that in its implementation we need a system for cost management and time management so that in its implementation, the project can be completed on time as planned and the costs incurred according to the needs of the project being worked on. In writing this article the main study is, how is the project performance in terms of cost and time, how is the application of EVA (Earned Value Analysis) to predict the costs and the final time of completion of the project, are there any advantages or disadvantages that may occur in the completion of a construction project PT Graha Praja Kencana Residential Building in Ceguk Village, Tlanakan District, Pamekasan Regency? To answer this problem, a qualitative approach with a descriptive type was conducted. Sources of data obtained through interviews, observations, and documentation with respondents, namely consultants, contractors, and the Director of PT Graha Praja Kencana. From the results of data analysis, it can be concluded that shows that the costs incurred are lower than the planned budget, the time of project implementation according to the schedule from the initial planning, the costs incurred every week from week 1 to week 9 experienced a very significant increase, and the profits obtained by the contractor until the end of the project starting from the first week to the 9th week of Rp. Rp. 8,978,737.20.