GEOSTEERING OF TWO HORIZONTAL WELLS IN SOUTH UMM GUDAIR FIELD: A SUCCESSFUL CASE HISTORY

2005 ◽  
Vol 45 (1) ◽  
pp. 55
Author(s):  
M. Jha ◽  
T. Tran ◽  
D. Hawkins

The South Umm Gudair (SUG) oil field located in the Neutral zone between Kuwait and Saudi Arabia has produced since 1968 from an active water drive carbonate reservoir of Lower Cretaceous age. The lower zones are homogenous intervals of higher permeability which appear to be sufficiently swept by natural water drive over a period of time. The upper zones of the reservoir have lower permeability, are relatively thin and are bound by tighter intervals that act as possible barriers to the natural water drive system.Geosteering techniques are now extensively used in oil and gas industry for horizontal wells to produce hydrocarbons from thin reservoirs to maximise recovery, and restricting water-coning problems. Recent advancements in well placement using Geosteering allow successful targetting of low permeability reservoir with great precision which results in exposing more drainage area in the target pay.The geosteering technique was considered for the first time in joint operation’s SUG field targetting two horizontal wells. Improved well productivity is achieved through optimised well placement. This success has led to a development plan and strategy of additional horizontal drilling locations to maximise recovery of un-swept oil from the low permeability reservoirs. This paper reviews the success of Geosteering in SUG’s two horizontal wells, completed in July 2004.

2012 ◽  
Vol 241-244 ◽  
pp. 1396-1399
Author(s):  
Gui Min Nie ◽  
Dan Guo ◽  
Yan Wang ◽  
Xiao Wei Cheng

With the depletion of shallow-layer oil and gas pools inLiaohe oilfield, buried hill stratigraphic reservoirs in Liaohe oil field are becoming main objectives for exploration in recent years, especially in high-risk areas of Xinglongtai deep the Hing ancient buried hill resources are particularly rich. Since 2007, Liaohe oilfield increased investment for Buried Hill reservoirs with deep horizontal drilling developt the buried hill reservoir. Liaohe has completed 36 deep horizontal, with a total footage of 183920m, the average depth of 5109m. Improving drilling speed of "buried hill deep horizontal and branch horizontal wells”, and reducing drilling costs are of great urgency. “Hing buried hill deep horizontal, horizontal wells,” with composite drilling technology, supporting the optimization of PDC bits, the high-pressure jet drilling, the MWD borehole trajectory control and optimization of drilling parameters, the new drilling fluid technology and so on. With a large number of horizontal wells put into Buried Hill stratigraphic reservoirs, oil and gas production of average deep horizontal well increase of 2-5 times. Besides, the previous recovery and production of oil and gas reservoirs significantly improved to create an objective economic and social benefits.


2018 ◽  
Vol 785 ◽  
pp. 34-39
Author(s):  
Vadim Aleksandrov ◽  
Marsel Kadyrov ◽  
Andrey Ponomarev ◽  
Denis Drugov ◽  
Mikhail Zavatskij

One of the acutest problems in the oil and gas industry is the efficient development of low-permeability reservoirs in Jurassic sediments. At that, the choice of efficient technologies can be made basing on the analysis of field-geological and laboratory data, as well as the analysis of previously conducted activities with account of facies genesis of reservoir rocks in the wells, where the geotechnical activities (GTA) are realized. The research objective is the assessment of bottomhole formation zone (BFZ) results for the YUS11 development wells at the Fainsk oil field with the application of hydrocarbon solvents and acid compounds. Using detailed field-geological analysis, the data obtained after the processing of a bottomhole formation area of the development wells with the application of hydrocarbon solvents and acid compounds was assessed.


2019 ◽  
Vol 3 (1) ◽  
pp. 1-14
Author(s):  
Miriam R. Aczel ◽  
Karen E. Makuch

High-volume hydraulic fracturing combined with horizontal drilling has “revolutionized” the United States’ oil and gas industry by allowing extraction of previously inaccessible oil and gas trapped in shale rock [1]. Although the United States has extracted shale gas in different states for several decades, the United Kingdom is in the early stages of developing its domestic shale gas resources, in the hopes of replicating the United States’ commercial success with the technologies [2, 3]. However, the extraction of shale gas using hydraulic fracturing and horizontal drilling poses potential risks to the environment and natural resources, human health, and communities and local livelihoods. Risks include contamination of water resources, air pollution, and induced seismic activity near shale gas operation sites. This paper examines the regulation of potential induced seismic activity in Oklahoma, USA, and Lancashire, UK, and concludes with recommendations for strengthening these protections.


Author(s):  
Patrick Nwafor ◽  
Kelani Bello

A Well placement is a well-known technique in the oil and gas industry for production optimization and are generally classified into local and global methods. The use of simulation software often deployed under the direct optimization technique called global method. The production optimization of L-X field which is at primary recovery stage having five producing wells was the focus of this work. The attempt was to optimize L-X field using a well placement technique.The local methods are generally very efficient and require only a few forward simulations but can get stuck in a local optimal solution. The global methods avoid this problem but require many forward simulations. With the availability of simulator software, such problem can be reduced thus using the direct optimization method. After optimization an increase in recovery factor of over 20% was achieved. The results provided an improvement when compared with other existing methods from the literatures.


2020 ◽  
pp. 42-45
Author(s):  
J.A. Kerimov ◽  

The implementation of plastic details in various constructions enables to reduce the prime cost and labor intensity of machine and device manufacturing, decrease the weight of design and improve their quality and reliability at the same time. The studies were carried out with the aim of labor productivity increase and substitution of colored and black metals with plastic masses. For this purpose, the details with certain characteristics were selected for further implementation of developed technological process in oil-gas industry. The paper investigates the impact of cylinder and compression mold temperature on the quality parameters (shrinkage and hardness) of plastic details in oil-field equipment. The accessible boundaries of quality indicators of the details operated in the equipment of exploration, drilling and exploitation of oil and gas industry are studied in a wide range of mode parameters. The mathematic dependences between quality parameters (shrinkage and hardness) of the details on casting temperature are specified.


2021 ◽  
Vol 73 (10) ◽  
pp. 45-45
Author(s):  
Martin Rylance

Communication and prediction are symmetrical. Communication, in effect, is prediction about what has happened. And prediction is communication about what is going to happen. Few industries contain as many phases, steps, and levels of interface between the start and end product as the oil and gas industry—field, office, offshore, plant, subsea, downhole, not to mention the disciplinary, functional, managerial, logistics handovers, and boundaries that exist. It therefore is hardly surprising that communication, in all its varied forms, is at the very heart of our business. The papers selected this month demonstrate how improved communication can deliver the prediction required for a variety of reasons, including safety, efficiency, and informational purposes. The application of new and exciting ways of working, partially accelerated by recent events, is leading to breakthrough improvements on all levels. Real-time processing, improved visualization, and predictive and machine-learning methods, as well as improvements in all forms of data communication, are all contributing to incremental enhancements across the board. This month, I encourage the reader to review the selected articles and determine where and how the communication and prediction are occurring and what they are delivering. Then perhaps consider performing an exercise wherein your own day-to-day roles—your own areas of communication, interfacing, and cooperation—are reviewed to see what enhancements you can make as an individual. You may be pleasantly surprised that some simple tweaks to your communication style, frequency, and format can deliver quick wins. In an era of remote working for many individuals, it is an exercise that has some value. Recommended additional reading at OnePetro: www.onepetro.org. OTC 30184 - Augmented Machine-Learning Approach of Rate-of-Penetration Prediction for North Sea Oil Field by Youngjun Hong, Seoul National University, et al. OTC 31278 - A Digital Twin for Real-Time Drilling Hydraulics Simulation Using a Hybrid Approach of Physics and Machine Learning by Prasanna Amur Varadarajan, Schlumberger, et al. OTC 31092 - Integrated Underreamer Technology With Real-Time Communication Helped Eliminate Rathole in Exploratory Operation Offshore Nigeria by Raphael Chidiogo Ozioko, Baker Hughes, et al.


2021 ◽  
Author(s):  
Henry Ijomanta ◽  
Lukman Lawal ◽  
Onyekachi Ike ◽  
Raymond Olugbade ◽  
Fanen Gbuku ◽  
...  

Abstract This paper presents an overview of the implementation of a Digital Oilfield (DOF) system for the real-time management of the Oredo field in OML 111. The Oredo field is predominantly a retrograde condensate field with a few relatively small oil reservoirs. The field operating philosophy involves the dual objective of maximizing condensate production and meeting the daily contractual gas quantities which requires wells to be controlled and routed such that the dual objectives are met. An Integrated Asset Model (IAM) (or an Integrated Production System Model) was built with the objective of providing a mathematical basis for meeting the field's objective. The IAM, combined with a Model Management and version control tool, a workflow orchestration and automation engine, A robust data-management module, an advanced visualization and collaboration environment and an analytics library and engine created the Oredo Digital Oil Field (DOF). The Digital Oilfield is a real-time digital representation of a field on a computer which replicates the behavior of the field. This virtual field gives the engineer all the information required to make quick, sound and rational field management decisions with models, workflows, and intelligently filtered data within a multi-disciplinary organization of diverse capabilities and engineering skill sets. The creation of the DOF involved 4 major steps; DATA GATHERING considered as the most critical in such engineering projects as it helps to set the limits of what the model can achieve and cut expectations. ENGINEERING MODEL REVIEW, UPDATE AND BENCHMARKING; Majorly involved engineering models review and update, real-time data historian deployment etc. SYSTEM PRECONFIGURATION AND DEPLOYMENT; Developed the DOF system architecture and the engineering workflow setup. POST DEPLOYMENT REVIEW AND UPDATE; Currently ongoing till date, this involves after action reviews, updates and resolution of challenges of the DOF, capability development by the operator and optimizing the system for improved performance. The DOF system in the Oredo field has made it possible to integrate, automate and streamline the execution of field management tasks and has significantly reduced the decision-making turnaround time. Operational and field management decisions can now be made within minutes rather than weeks or months. The gains and benefits cuts across the entire production value chain from improved operational safety to operational efficiency and cost savings, real-time production surveillance, optimized production, early problem detection, improved Safety, Organizational/Cross-discipline collaboration, data Centralization and Efficiency. The DOF system did not come without its peculiar challenges observed both at the planning, execution and post evaluation stages which includes selection of an appropriate Data Gathering & acquisition system, Parts interchangeability and device integration with existing field devices, high data latency due to bandwidth, signal strength etc., damage of sensors and transmitters on wellheads during operations such as slickline & WHM activities, short battery life, maintenance, and replacement frequency etc. The challenges impacted on the project schedule and cost but created great lessons learnt and improved the DOF learning curve for the company. The Oredo Digital Oil Field represents a future of the oil and gas industry in tandem with the industry 4.0 attributes of using digital technology to drive efficiency, reduce operating expenses and apply surveillance best practices which is required for the survival of the Oil and Gas industry. The advent of the 5G technology with its attendant influence on data transmission, latency and bandwidth has the potential to drive down the cost of automated data transmission and improve the performance of data gathering further increasing the efficiency of the DOF system. Improvements in digital integration technologies, computing power, cloud computing and sensing technologies will further strengthen the future of the DOF. There is need for synergy between the engineering team, IT, and instrumentation engineers to fully manage the system to avoid failures that may arise from interface management issues. Battery life status should always be monitored to ensure continuous streaming of real field data. New set of competencies which revolves around a marriage of traditional Petro-technical skills with data analytic skills is required to further maximize benefit from the DOF system. NPDC needs to groom and encourage staff to venture into these data analytic skill pools to develop knowledge-intelligence required to maximize benefit for the Oredo Digital Oil Field and transfer this knowledge to other NPDC Asset.


2021 ◽  
pp. 1-16
Author(s):  
Sulaiman A. Alarifi ◽  
Jennifer Miskimins

Summary Reserves estimation is an essential part of developing any reservoir. Predicting the long-term production performance and estimated ultimate recovery (EUR) in unconventional wells has always been a challenge. Developing a reliable and accurate production forecast in the oil and gas industry is mandatory because it plays a crucial part in decision-making. Several methods are used to estimate EUR in the oil and gas industry, and each has its advantages and limitations. Decline curve analysis (DCA) is a traditional reserves estimation technique that is widely used to estimate EUR in conventional reservoirs. However, when it comes to unconventional reservoirs, traditional methods are frequently unreliable for predicting production trends for low-permeability plays. In recent years, many approaches have been developed to accommodate the high complexity of unconventional plays and establish reliable estimates of reserves. This paper provides a methodology to predict EUR for multistage hydraulically fractured horizontal wells that outperforms many current methods, incorporates completion data, and overcomes some of the limitations of using DCA or other traditional methods to forecast production. This new approach is introduced to predict EUR for multistage hydraulically fractured horizontal wells and is presented as a workflow consisting of production history matching and forecasting using DCA combined with artificial neural network (ANN) predictive models. The developed workflow combines production history data, forecasting using DCA models and completion data to enhance EUR predictions. The predictive models use ANN techniques to predict EUR given short early production history data (3 months to 2 years). The new approach was developed and tested using actual production and completion data from 989 multistage hydraulically fractured horizontal wells from four different formations. Sixteen models were developed (four models for each formation) varying in terms of input parameters, structure, and the production history data period it requires. The developed models showed high accuracy (correlation coefficients of 0.85 to 0.99) in predicting EUR given only 3 months to 2 years of production data. The developed models use production forecasts from different DCA models along with well completion data to improve EUR predictions. Using completion parameters in predicting EUR along with the typical DCA is a major addition provided by this study. The end product of this work is a comprehensive workflow to predict EUR that can be implemented in different formations by using well completion data along with early production history data.


2021 ◽  
Author(s):  
Alexander Katashov ◽  
Igor Novikov ◽  
Evgeny Malyavko ◽  
Nadir Husein

Abstract Over the past few years, the oil and gas industry has faced a situation of high fluctuations in hydrocarbon prices on the world market. In addition, the trend for the depletion of traditional hydrocarbon reservoirs and the search for new effective solutions for the management and control of field development using horizontal and multilateral wells is still relevant. The most common method for horizontal wells testing is production logging tools (PLT) on coiled tubing (CT) or downhole tractor, which is associated with HSE risks and high cost, especially on offshore platforms, which limits the widespread use of this technology. The solution without such risks is the method of marker well monitoring, which allows obtaining information about the profile and composition of the inflow in a dynamic mode in horizontal wells without well intervention. There are several types of tracer (marker) carriers and today we will consider an approach to placing marker monitoring systems as part of a completion for three-phase oil, water and gas monitoring.


Author(s):  
Sorin Alexandru Gheorghiu ◽  
Cătălin Popescu

The present economic model is intended to provide an example of how to take into consideration risks and uncertainties in the case of a field that is developed with water injection. The risks and uncertainties are related, on one hand to field operations (drilling time, delays due to drilling problems, rig failures and materials supply, electric submersible pump [ESP] installations failures with the consequences of losing the well), and on the other hand, the second set of uncertainties are related to costs (operational expenditures-OPEX and capital expenditures-CAPEX, daily drilling rig costs), prices (oil, gas, separation, and water injection preparation), production profiles, and discount factor. All the calculations are probabilistic. The authors are intending to provide a comprehensive solution for assessing the business performance of an oil field development.


Sign in / Sign up

Export Citation Format

Share Document