Determination of the maximum cyclic rating of high-voltage power transformers

1998 ◽  
Vol 12 (1) ◽  
pp. 17-20 ◽  
Author(s):  
P.M. Brown ◽  
J.P. White
Energies ◽  
2021 ◽  
Vol 14 (13) ◽  
pp. 3799
Author(s):  
Pawel Rozga ◽  
Abderahhmane Beroual

Progression in the field of insulating materials for power transformers and other high voltage devices is visible regardless of the type of insulation: solid, liquid, or gas [...]


2020 ◽  
Vol 1679 ◽  
pp. 022045
Author(s):  
S B Rybalka ◽  
E A Kulchenkov ◽  
A A Demidov ◽  
N A Zhemoedov ◽  
A Yu Drakin ◽  
...  

1971 ◽  
Vol 25 (3) ◽  
pp. 342-344 ◽  
Author(s):  
John P. Cummings ◽  
Ronald H. Hall ◽  
Ronald J. Plenzler

This paper presents an analytical method for the determination of minor metals in white cast iron fused buttons. This method enables the measurement of metals in cast iron with rapidity and excellent analytical results. Buttons of 40 g appear to be ideal but smaller button samples can be tolerated. The fused buttons have good homogeneity, very slight weight loss, and no significant change in composition. Metal cast spectrochemical samples are analyzed in an inert atmosphere utilizing a high voltage spark.


2010 ◽  
Vol 171-172 ◽  
pp. 171-174
Author(s):  
Hong Cheng ◽  
Peng Kun Liu ◽  
Yu Ling Wang ◽  
Chang Xin Nai

The dipole spacing can directly affects the detecting sensitivity and accuracy in the landfill leakage detection by the high voltage direct current method. Based on the high voltage DC detecting model, the impact of dipole spacing on locating leaks is analyzed taking a single leak and multiple leaks as example. The results show that the greater the dipole spacing is, the higher the detecting sensitivity is; the smaller the dipole spacing is, the higher the detecting accuracy is. For multiple leaks, only one leak can be located when the dipole spacing is greater than the distance between the two leaks. In order to detect all leaks correctly, the dipole spacing should be smaller than the distance between the two leaks.


Author(s):  
YU.N. BULATOV ◽  
◽  
A.V. KRYUKOV ◽  
A.V. CHEREPANOV ◽  
A.E. KRYUKOV ◽  
...  
Keyword(s):  

Author(s):  
A. V. Lykin ◽  
E. A. Utkin

The article considers the feasibility of changing the structure of a distribution electrical network by transferring points of electricity transformation as close to consumers as possible. This approach is based on installation of pole-mounted transformer substations (PMTS) near consumer groups and changes the topology of the electrical network. At the same time, for groups of consumers, the configuration of sections of the low-voltage network, including service drops, changes. The efficiency of approaching transformer substations to consumers was estimated by the reduction in electrical energy losses due to the expansion of the high-voltage network. The calculation of electrical losses was carried out according to twenty-four hour consumer demand curve. To estimate the power losses in each section of the electrical network of high and low voltage, the calculated expressions were obtained. For the considered example, the electrical energy losses in the whole network with a modified topology is reduced by about two times, while in a high-voltage network with the same transmitted power, the losses are reduced to a practically insignificant level, and in installed PMTS transformers they increase mainly due to the rise in total idle losses. The payback period of additional capital investments in option with modified topology will be significantly greater if payback is assessed only by saving losses cost. Consequently, the determination of the feasibility of applying this approach should be carried out taking into account such factors as increasing the reliability of electricity supply, improving the quality of electricity, and increasing the power transmission capacity of the main part of electrical network.


Sign in / Sign up

Export Citation Format

Share Document