Investigation of sludge reduction and biogas generation in high-rate anaerobic side-stream reactors for wastewater treatment

2018 ◽  
Vol 4 (11) ◽  
pp. 1829-1838 ◽  
Author(s):  
Chul Park ◽  
Dong-Hyun Chon ◽  
Aaron Brennan ◽  
Heonseop Eom

Activated sludge systems incorporating a 2 day anaerobic side-stream reactor (ASSR) show significantly decreased waste sludge production.

2012 ◽  
Vol 573-574 ◽  
pp. 526-533
Author(s):  
Wei Fei Huang ◽  
Ying Gang Shu ◽  
Lu Cai ◽  
Sheng Liang Si

L. hoffmeisteri was inoculated in reactor to investigate the effects on waste sludge and wastewater to reduce excess sludge and reduce the environmental risk of heavy metals in sludge and effluent in this study. The result showed a gravimetric sludge reduction of 53.8% and modification in the texture of the sludge. The residual form of heavy metals (As, Cd, Cr, Cu, Ni, Pb and Zn) was increased, which reduced the risk of the phytoaccumulation. An evident concentration of heavy metals in worm faece and a bioaccumulation of heavy metals in aquatic worms were also observed. Activated sludge is reduced significantly, sludge settleability is improved and the bioavailability of heavy metals in waste sludge is minimized, which are beneficial to wastewater treatment and safe disposal of waste sludge.


1990 ◽  
Vol 22 (7-8) ◽  
pp. 131-138
Author(s):  
Ahmed Fadel

Many of Egypt's cities have existing treatment plants under operation that have been constructed before 1970. Almost all of these treatment plants now need rehabilitation and upgrading to extend their services for a longer period. One of these plants is the Beni Suef City Wastewater Treatment Plant. The Beni Suef WWTP was constructed in 1956. It has primary treatment followed by secondary treatment employing intermediate rate trickling filters. The BOD, COD, and SS concentration levels are relatively high. They are approximately 800, 1100, and 600 mg/litre, respectively. The Beni Suef city required the determination of the level of work needed for the rehabilitation and upgrading of the existing 200 l/s plant and to extend its capacity to 440 l/s at year 2000 A description of the existing units, their deficiencies and operation problems, and the required rehabilitation are presented and discussed in this paper. Major problems facing the upgrading were the lack of space for expansion and the shortage of funds. It was, therefore, necessary to study several alternative solutions and methods of treatment. The choice of alternatives was from one of the following schemes: a) changing the filter medium, its mode of operation and increasing the number of units, b) changing the trickling filter to high rate and combining it with the activated sludge process, for operation by one of several possible combinations such as: trickling filter-solids contact, roughing filter-activated sludge, and trickling filter-activated sludge process, c) dividing the flow into two parts, the first part to be treated using the existing system and the second part to be treated by activated sludge process, and d) expanding the existing system by increasing the numbers of the different process units. The selection of the alternative was based on technical, operational and economic evaluations. The different alternatives were compared on the basis of system costs, shock load handling, treatment plant operation and predicted effluent quality. The flow schemes for the alternatives are presented. The methodology of selecting the best alternative is discussed. From the study it was concluded that the first alternative is the most reliable from the point of view of costs, handling shock load, and operation.


1994 ◽  
Vol 30 (4) ◽  
pp. 211-214 ◽  
Author(s):  
E. Brands ◽  
M. Liebeskind ◽  
M. Dohmann

This study shows a comparison of important parameters for dynamic simulation concerning the highrate and low-rate activated sludge tanks of several municipal wastewater treatment plants. The parameters for the dynamic simulation of the single-stage process are quite well known, but parameters for the high-ratellow-rate activated sludge process are still missi ng, although a considerable number of wastewater treatment plants are designed and operated that way. At present any attempt to simulate their operation is restricted to the second stage due to missing data concerning growth rate, decay rate, yield coefficient and others.


2014 ◽  
Vol 54 ◽  
pp. 337-346 ◽  
Author(s):  
Adriana Maria Lotito ◽  
Marco De Sanctis ◽  
Claudio Di Iaconi ◽  
Giovanni Bergna

2013 ◽  
Vol 2013 (15) ◽  
pp. 2669-2686 ◽  
Author(s):  
Heonseop Eom ◽  
Aaron Brennan ◽  
Chris Watt ◽  
Dong-Hyun Chon ◽  
Chul Park

1998 ◽  
Vol 37 (12) ◽  
pp. 77-85 ◽  
Author(s):  
T. Ohtsuki ◽  
T. Kawazoe ◽  
T. Masui

An intelligent control system for wastewater treatment processes has been developed and applied to fullscale, high-rate, activated sludge process control. In this control system, multiple software agents that model the target system using their own modeling method collaborate by using data stored in an abstracted database named ‘blackboard’. The software agents, which are called ‘expert modules’, include a fuzzy expert system, a fuzzy controller, a theoretical activated sludge model, and evaluators of raw data acquired by various online sensors including a respirometer. In this paper, the difficulties of controlling an activated sludge system by using a single conventional strategy are briefly reviewed, then our approach to overcome these difficulties by using multiple modeling methods in the framework of an ‘intelligent control system’ is proposed. Case studies of applications to a high-rate activated sludge process that treats BOD and nitrogen of human excrement are also presented.


1997 ◽  
Vol 36 (11) ◽  
pp. 171-179 ◽  
Author(s):  
J. H. Rensink ◽  
W. H. Rulkens

Pilot plant experiments have been carried out to study the mineralization of sludge from biological wastewater treatment plants by worms such as Tubificidae. Trickling filters filled with lava slags were continuously fed with a certain quantity of excess activated sludge of a Dutch brewery wastewater treatment plant (Bavaria) by recirculation during 10 to 14 days. At the starting point of each experiment the trickling filters were inoculated with Tubificidae. Recirculation of sludge showed that use of Tubificidae resulted in a COD reduction of the sludge (mixed liquor) of 18–67–. Without worms this reduction was substantially lower. The sludge production in a pilot activated sludge system for treating settled domestic wastewater reduced from 0.40 to 0.15 g MLSS/g COD removed when Tubificidae were added to the system. The lower amounts of sludge were always accompanied by an increase of nitrate and phosphate concentration in the wastewater. There was no disturbance of the nitrification process. Application of Tubificidae or other worms may have interesting potential for practical application.