Distribution of Earthquakes on a Branching Fault System Using Integer Programming and Greedy‐Sequential Methods

2020 ◽  
Vol 21 (9) ◽  
Author(s):  
Eric L. Geist ◽  
Tom Parsons
Author(s):  
F. Al-Kufaishi

Two localities (Al-Marij and Laik) were selected to investigate the type of Quartz Grains from crustal material formed by evaporation of waters discharged by springs in Hit area, western Iraq, Previous studies on the crustal material (1,2) showed that the water discharged by these springs are associated with Abu-Jir fault system which run parallel to the Euphrates river,Factor analyses of the crustal and soil materials (50 samples analysed for 16 variables)(2) showed five factors; the first factor includes SiO2, Al2O3 and TiO2 with positive factor loading, and CaO, L.O.I. with negative loading and hence lead to the conclusion that the distribution of these variables is a reflection of transported clay material.This study concentrates on the use of SEM to investigate the contribution of Quartz grains found in the crustal material on two selected sites.


Author(s):  
Fransiskus Lauson Matondang ◽  
Rosnani Ginting

PT XYZ sering mengalami keterlambatan waktu karena dalam setiap keterlambatan yang dilakukan selalu ada penalty yang diberikan kepada perusahaan dan hal ini mengakibatkan tambahan biaya , oleh karena itu hal ini harus dihindari dengan membuat penjadwalan yang efisien, dalam hal ini dilakukanlah perbaikan dengan meminimisasi waktu penyelesaian maksimum Cmax pada mesin paralel yang berpola aliran flowshop (dan tidak boleh dilakukan interupsi yang dilakukan pada pekerjaan yang sedang diproses, untuk melakukan pekerjaan lainnya, satu lintasan hanya memproduksi satu produk dan hanya satu produk juga yang dikerjakan secara langsung. Waktu penyelesaian yang berbeda dari setiap mesin dengan pengerjaannya juga adalah masalah yang dihadapi untuk menjadikan mesin mesin ini sesuai menjadi satu penjadwalan yang terintegrasi dengan metode integer programming yang membuat penjadwalan dengan konsep riset operasi dengan metode pendekatan 0-1 utuk menjadi lebih efisien lagi , dihasilkan minimisasi keterlambatan total penyelesaian order dengan 42,28 menit lebih baik dari sebelumnya.   PT XYZ often experiences time delays because in every delay made there is always a penalty given to the company and this results in additional costs, therefore this must be avoided by making efficient scheduling, in this case repairs are carried out by minimizing the maximum completion time of Cmax on parallel machines that are patterned with flowshop flow (and no interruptions should be carried out on the work being processed, to do other work, one track only produces one product and only one product is directly worked. Different completion times of each machine with the workmanship is also the problem faced to make this machine suitable to be one scheduling integrated with integer programming methods that makes scheduling with the operational research concept with the 0-1 approach method to be more efficient, resulting in minimization of the delay in the total settlement of orders with 42.28 minutes was better than before.


1944 ◽  
Author(s):  
G.C. Hardin ◽  
H.J. Klepser ◽  
H.D. Trace ◽  
W.R. Thurston
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document