scholarly journals Variance Minimization – Relationship between Completion-Time Variance and Waiting-Time Variance

Author(s):  
S. Zhou ◽  
X. Cai

AbstractThe completion-time variance (CTV) and the waiting-time variance (WTV) are two performance measures which are commonly used in optimization of single-machine scheduling systems. This paper shows that when the number of jobs is large the two measures are nearly equivalent in a probabilistic environment.

2007 ◽  
Vol 24 (02) ◽  
pp. 245-261 ◽  
Author(s):  
JI-BO WANG ◽  
T. C. EDWIN CHENG

This paper deals with the machine scheduling problems with the effects of deterioration and learning. In this model the processing times of jobs are defined as functions of their starting times and positions in a sequence. We introduce polynomial solutions for some single machine problems and flow shop problems. The performance measures include makespan, total completion time, total weighted completion time, and maximum lateness.


Sign in / Sign up

Export Citation Format

Share Document