A pilot study for retrospective evaluation of cured-in-place pipe (CIPP) rehabilitation of municipal gravity sewers
2014 ◽
Vol 39
◽
pp. 82-93
◽
2019 ◽
Vol 21
(6)
◽
pp. 1199-1205
◽
2019 ◽
Vol 66
(1)
◽
pp. 38-43
◽
Keyword(s):
2018 ◽
Vol 27
(2)
◽
pp. 827-835
◽
2003 ◽
Vol 41
(7)
◽
pp. 649-654
◽
Keyword(s):
1973 ◽
Vol 37
(11)
◽
pp. 27-31
◽
1981 ◽
Vol 45
(2)
◽
pp. 71-73
◽
2019 ◽
Vol 62
(9)
◽
pp. 3397-3412
Keyword(s):
1997 ◽
Vol 24
(9)
◽
pp. 666-672
◽
1997 ◽
Vol 24
(8)
◽
pp. 553-559
◽