Construction of three vertical shafts using upward shield machine - the Bandai∼Hannan sewer tunnel construction works
2004 ◽
Vol 19
(4-5)
◽
pp. 491
◽
2011 ◽
Vol 71-78
◽
pp. 32-36
◽
2018 ◽
Vol 55
(6)
◽
pp. 894-902
◽
1992 ◽
Vol 15
(4)
◽
pp. 235-243
Keyword(s):
Keyword(s):
2011 ◽
Vol 94-96
◽
pp. 2226-2232
Keyword(s):