scholarly journals Project Risk time Management – A Proposed Model and a Case Study in the Construction Industry

2015 ◽  
Vol 64 ◽  
pp. 24-31 ◽  
Author(s):  
Barbara Gładysz ◽  
Dariusz Skorupka ◽  
Dorota Kuchta ◽  
Artur Duchaczek
2020 ◽  
Vol 12 (21) ◽  
pp. 8905
Author(s):  
Wen Yi ◽  
Robyn Phipps ◽  
Hans Wang

This paper focuses on sustainable transportation of prefab products from factories to construction sites by ship. Since the transportation cost for all the prefab products of a construction site is mainly dependent on the number of cargo holds used on ships, a loading plan for prefab products that minimizes the number of holds required is highly desirable. This paper is therefore devoted to the development of an optimal loading plan that decides which prefab products are loaded into each cargo hold and how to pack these prefab products into the holds so that as few holds as possible are used. We formulate the problem as a large-scale integer optimization model whose objective function is to minimize the total number of cargo holds used and whose constraints represent the cargo hold capacity limits. We develop a heuristic to solve the problem and obtain a high-quality solution. We have tested the model and algorithm on a case study that includes 20 prefab products. We find that different cargo holds carry prefab products that have quite different densities. Moreover, the orientations of many prefab products are different from their default orientations. The results demonstrate the applicability of the proposed model and algorithm.


Author(s):  
Do Vu Phuong Anh

This research presents the results of applying the theory of competence framework to evaluate the current competence of middle management in enterprises, in the case study of DOJI Gemstone Jewelry Group (DOJI Group). By using in-depth interviews and survey through questionnaires, the research results show that the middle management level at DOJI Group has satisfied relatively well the most competencies of the professional competence group, executive management competence as well as personal development competence. However, some of the competencies that need to be further improved include time management, training and leadership competence, innovation and learning competence. The solutions given are for reference by DOJI Group and other private enterprises in Vietnam in the assessment and development of middle management level.


Complexity ◽  
2020 ◽  
Vol 2020 ◽  
pp. 1-15 ◽  
Author(s):  
Tinggui Chen ◽  
Shiwen Wu ◽  
Jianjun Yang ◽  
Guodong Cong ◽  
Gongfa Li

It is common that many roads in disaster areas are damaged and obstructed after sudden-onset disasters. The phenomenon often comes with escalated traffic deterioration that raises the time and cost of emergency supply scheduling. Fortunately, repairing road network will shorten the time of in-transit distribution. In this paper, according to the characteristics of emergency supplies distribution, an emergency supply scheduling model based on multiple warehouses and stricken locations is constructed to deal with the failure of part of road networks in the early postdisaster phase. The detailed process is as follows. When part of the road networks fail, we firstly determine whether to repair the damaged road networks, and then a model of reliable emergency supply scheduling based on bi-level programming is proposed. Subsequently, an improved artificial bee colony algorithm is presented to solve the problem mentioned above. Finally, through a case study, the effectiveness and efficiency of the proposed model and algorithm are verified.


2014 ◽  
Vol 7 (2) ◽  
pp. 263-284 ◽  
Author(s):  
Budi Hartono ◽  
Deo F.N. Wijaya ◽  
Hilya M. Arini

Purpose – The purpose of this paper is to develop and to empirically verify a model of project risk management maturity (PRMM). Design/methodology/approach – Theoretical work to develop the initial model of risk maturity. Empirical study by a cross-sectional survey to the Indonesian construction industry. Findings – A new model of PRMM is developed and empirically tested. The model is valid (face validity, content validity, discriminant validity, convergent validity, and criterion validity) and reliable. Research limitations/implications – A more comprehensive, follow-up study is required to gain more insights on the actual maturity level of Indonesian construction industry. Practical implications – The model is applicable to assess the organizational maturity level which in turn could be used for improving organization performance. Originality/value – The work demonstrates a novel approach in developing models by emphasizing on the empirical verification.


IEEE Access ◽  
2021 ◽  
pp. 1-1
Author(s):  
Amir Farmahini Farahani ◽  
Kaveh Khalili-Damghani ◽  
Hosein Didehkhani ◽  
Amir Homayoun Sarfaraz ◽  
Mehdi Hajirezaie

Buildings ◽  
2021 ◽  
Vol 11 (6) ◽  
pp. 260
Author(s):  
James Ellis ◽  
David John Edwards ◽  
Wellington Didibhuku Thwala ◽  
Obuks Ejohwomu ◽  
Ernest Effah Ameyaw ◽  
...  

This research explores the failure of competitively tendered projects in the UK construction industry to procure the most suited contractor(s) to conduct the works. Such work may have equal relevance for other developed nations globally. This research seeks to teach clients and their representatives that “lowest price” does not mean “best value”, by presenting a case study of a successfully negotiated tender undertaken by a small-to-medium enterprise (SME) contractor; SME studies are relatively scant in academic literature. By applying the “lessons learnt” principle, this study seeks to improve future practice through the development of a novel alternative procurement option (i.e., negotiation). A mixed philosophical stance combining interpretivism and pragmatism was used—interpretivism to critically review literature in order to form the basis of inductive research to discuss negotiation as a viable procurement route, and pragmatism to analyse perceptions of tendering and procurement. The methods used follow a three-stage waterfall process including: (1) literature review and pilot study; (2) quantitative analysis of case study data; and (3) qualitative data collection via a focus group. Our research underscores the need to advise clients and their representatives of the importance of understanding the scope of works allowed within a tender submission before discounting it based solely on price. In addition, we highlight the failings of competitive tendering, which results in increased costs and project duration once the works commence on site. These findings provide new contemporary insight into procurement and tendering in the construction industry, with emphasis on SME contractors, existing relationships, and open-book negotiation. This research illustrates the adverse effects of early cost estimates produced without first securing a true understanding of project buildability and programming. Our work concludes with a novel insight into an alternative procurement option that involves early SME contractor involvement in an open-book environment, without the need for a third-party cost control.


2021 ◽  
Vol 13 (15) ◽  
pp. 8238
Author(s):  
Noemi Bakos ◽  
Rosa Schiano-Phan

To transform the negative impacts of buildings on the environment into a positive footprint, a radical shift from the current, linear ‘make-use-dispose’ practice to a closed-loop ‘make-use-return’ system, associated with a circular economy, is necessary. This research aims to demonstrate the possible shift to a circular construction industry by developing the first practical framework with tangible benchmarks for a ‘Circular University Campus’ based on an exemplary case study project, which is a real project development in India. As a first step, a thorough literature review was undertaken to demonstrate the social, environmental and economic benefits of a circular construction industry. As next step, the guideline for a ‘Circular University Campus’ was developed, and its applicability tested on the case study. As final step, the evolved principles were used to establish ‘Project Specific Circular Building Indicators’ for a student residential block and enhance the proposed design through bioclimatic and regenerative design strategies. The building’s performance was evaluated through computational simulations, whole-life carbon analysis and a circular building assessment tool. The results demonstrated the benefits and feasibility of bioclimatic, regenerative building and neighbourhood design and provided practical prototypical case study and guidelines which can be adapted by architects, planners and governmental institutions to other projects, thereby enabling the shift to a restorative, circular construction industry.