Determining initial enrichment, burnup, and cooling time of pressurized-water-reactor spent fuel assemblies by analyzing passive gamma spectra measured at the Clab interim-fuel storage facility in Sweden
Keyword(s):
1989 ◽
Vol 111
(4)
◽
pp. 647-651
◽
2018 ◽
Vol 108
◽
pp. 052108
Keyword(s):
2012 ◽
Vol 250
◽
pp. 287-293
◽
Keyword(s):
Keyword(s):
2017 ◽
Vol 98
◽
pp. 213-227
◽
Keyword(s):