Limitations and drawbacks of using Preliminary Environmental Reports (PERs) as an input to Environmental Licensing in São Paulo State: A case study on natural gas pipeline routing
2007 ◽
Vol 27
(4)
◽
pp. 301-318
◽
Keyword(s):
2014 ◽
Vol 111
◽
pp. 33-46
◽
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):