A heuristic for the quay crane scheduling problem based on contiguous bay crane operations

2012 ◽  
Vol 39 (12) ◽  
pp. 2915-2928 ◽  
Author(s):  
Zhiqiang Lu ◽  
Xiaole Han ◽  
Lifeng Xi ◽  
Alan L. Erera
2018 ◽  
Vol 15 (3) ◽  
pp. 1399-1412 ◽  
Author(s):  
Zizhen Zhang ◽  
Ming Liu ◽  
Chung-Yee Lee ◽  
Jiahai Wang

2007 ◽  
Vol 10 (4-5) ◽  
pp. 327-336 ◽  
Author(s):  
Marcello Sammarra ◽  
Jean-François Cordeau ◽  
Gilbert Laporte ◽  
M. Flavia Monaco

2015 ◽  
Vol 36 ◽  
pp. 87-94 ◽  
Author(s):  
Noura Al-Dhaheri ◽  
Ali Diabat

2012 ◽  
Vol 39 (18) ◽  
pp. 13108-13117 ◽  
Author(s):  
Narges Kaveshgar ◽  
Nathan Huynh ◽  
Saeed Khaleghi Rahimian

2005 ◽  
Vol 53 (1) ◽  
pp. 45-59 ◽  
Author(s):  
Luigi Moccia ◽  
Jean-François Cordeau ◽  
Manlio Gaudioso ◽  
Gilbert Laporte

Sign in / Sign up

Export Citation Format

Share Document