Evaluating project completion time in project networks with discrete random activity durations

2009 ◽  
Vol 36 (10) ◽  
pp. 2716-2722 ◽  
Author(s):  
Maria Elena Bruni ◽  
Francesca Guerriero ◽  
Erika Pinto
2015 ◽  
Vol 31 (5) ◽  
pp. 04014086 ◽  
Author(s):  
Seyed Taha Hossein Mortaji ◽  
Rassoul Noorossana ◽  
Morteza Bagherpour

2021 ◽  
Vol 14 (2) ◽  
pp. 19
Author(s):  
Faris Rizal Andardi

PERT is a simplified software, to produce the expected project completion probability based on the duration or duration of a particular contract. In developing the PERT method a lot of research was carried out to perfect this method. The purpose of this study is to determine the overall duration of project completion, the magnitude of the project probability that can be completed in less than 170 days and more than 170 days, and the project completion time with the highest probability. Results of Analysis of Implementation of Scheduling System with PERT Method in Rehabilitation and Improvement of Traditional Market Infrastructure Projects in Malang City is the total duration of simulation results obtained 168 days faster than the 172 day plan. The probability of completing the 168 day project is 50%, while the probability of completing the 172 day project is 85.31%. The highest chance of the project being completed is 99.97%, with a duration of 181 days.


2020 ◽  
Vol 24 (10) ◽  
pp. 2861-2875
Author(s):  
Hsien-Kuan Chang ◽  
Wen-Der Yu ◽  
Tao-Ming Cheng

1991 ◽  
Vol 8 (3) ◽  
pp. 179-184 ◽  
Author(s):  
Chandra S. Putcha ◽  
Sridhar J. K. Rao

2017 ◽  
Vol 6 (4) ◽  
pp. 1-14 ◽  
Author(s):  
Enobong Udoumoh ◽  
Daniel Ebong ◽  
Iberedem Iwok

Sign in / Sign up

Export Citation Format

Share Document