Minimizing the number of late jobs for the permutation flowshop problem with secondary resources
2008 ◽
Vol 35
(4)
◽
pp. 1227-1249
◽
Keyword(s):
Keyword(s):
2008 ◽
Vol 189
(3)
◽
pp. 1284-1304
◽
Keyword(s):
2011 ◽
Vol 61
(3)
◽
pp. 782-787
◽
2017 ◽
Vol 79
◽
pp. 23-36
◽
1998 ◽
Vol 45
(5)
◽
pp. 525-532
◽