scholarly journals Kinetic analysis of enhanced biological phosphorus removal in a hybrid integrated fixed film activated sludge process

2008 ◽  
Vol 6 (1) ◽  
pp. 149-158 ◽  
Author(s):  
B. Hooshyari ◽  
A. Azimi ◽  
N. Mehrdadi
2016 ◽  
Vol 75 (3) ◽  
pp. 741-751 ◽  
Author(s):  
Yeshi Cao ◽  
Bee Hong Kwok ◽  
Mark C. M. van Loosdrecht ◽  
Glen T. Daigger ◽  
Hui Yi Png ◽  
...  

Mainstream partial nitritation and Anammox (PN/A) has been observed and studied in the step-feed activated sludge process at the Changi water reclamation plant (WRP), which is the largest WRP (800,000 m3/d) in Singapore. This paper presents the study results for enhanced biological phosphorus removal (EBPR) co-existing with PN/A in the activated sludge process. Both the in-situ EBPR efficiency and ex-situ activities of phosphorus release and uptake were high. The phosphorus accumulating organisms were dominant, with little presence of glycogen accumulating organisms in the activated sludge. Chemical oxygen demand (COD) mass balance illustrated that the carbon usage for EBPR was the same as that for heterotrophic denitrification, owing to autotrophic PN/A conversions. This much lower carbon demand for nitrogen removal, compared to conventional biological nitrogen removal, made effective EBPR possible. This paper demonstrated for the first time the effective EBPR co-existence with PN/A in the mainstream in a large full-scale activated sludge process, and the feasibility to accommodate EBPR into the mainstream PN/A process. It also shows EBPR can work under warm climates.


2009 ◽  
Vol 59 (5) ◽  
pp. 857-865 ◽  
Author(s):  
Y. Cao ◽  
C. M. Ang ◽  
K. C. Chua ◽  
F. W. Woo ◽  
H. Chi ◽  
...  

This paper presents the investigation results of retrofitting an anoxic selector to an anaerobic selector through stepwise reduction of air supply in a full-scale activated sludge process with a focus on enhanced biological phosphorus removal (EBPR). The process experienced gradual shift from a Ludzack-Ettinger (LE) to an anaerobic-anoxic-oxic (A2O) process and subsequently, an anaerobic-oxic (A/O) process. The major findings are: (i) the average influent-based PO43−-P release in the anaerobic selector compartment was 16.3 mg P l−1 and that in the secondary clarifier was 1.7 mg P l−1. 75% of the SCOD and 93% of the acetic acid in the primary effluent were taken up in the anaerobic selector compartment, respectively; (ii) PO43−-P uptake contributed by both aerobic and denitrifying phosphorus accumulating organisms (DPAOs) occurred mainly in the first and second aerobic lanes together with simultaneous nitrification and denitrification (SND) while there was not much contribution from the last aerobic lane; (iii) The average PO43−-P concentration of the final effluent was 2.4 mg P l−1 corresponding to a removal efficiency of 85%; (iv) the SVI was satisfactory after retrofitting; and (v) the increase of NH4+-N in the final effluent from the commencement to the completion of the retrofitting resulted in an approximate 40–50% reduction in oxygen demand and a significant aeration energy saving was achieved.


1985 ◽  
Vol 17 (11-12) ◽  
pp. 23-41 ◽  
Author(s):  
M. C. Hascoet ◽  
M. Florentz ◽  
P. Granger

Enhanced biological phosphorus removal from wastewater by means of microorganisms found in activated sludge has for the past few years been the subject of much research and it is now commonly recognized that an activated sludge system must include alternating anaerobic-aerobic periods. The present article covers biochemical aspects of this phenomenon using a phosphorus removing biomass obtained in a laboratory-scale pilot with alternating phases and a synthetic substrate feed. The percentage of phosphorus obtained in the pilot sludge was four times greater than that of a conventional sludge plant. By exposing the same biomass to different conditions and using 31P Nuclear Magnetic Resonance, we were able to accurately pin-point the various forms of phosphorus found within cells and follow their development during the course of alternating phases. The following results were obtained:the transformation of phosphorus in its inorganic to polyphosphate form depends on the medium's level of oxygenation,the presence of nitrates disturbs the anaerobic period but does not affect phosphorus uptake in the aerated period.Continuous nitrate addition alters biomass behaviour in the anaerobic phase, which loses the capacity to release phosphorus,copper at a concentration of over 1 mg Cu2+/1 inhibits phosphorus uptake in the aerated phase. Various microbiological analyses made on the pilot biomass isolated conventional bacteria found in activated sludge.


2003 ◽  
Vol 47 (11) ◽  
pp. 115-122 ◽  
Author(s):  
J. Manga ◽  
J. Ferrer ◽  
A. Seco ◽  
F. Garcia-Usach

A mechanistic mathematical model for nutrient and organic matter removal was used to describe the behavior of a nitrification denitrification enhanced biological phosphorus removal (NDEBPR) system. This model was implemented in a user-friendly software DESASS (design and simulation of activated sludge systems). A 484-L pilot plant was operated to verify the model results. The pilot plant was operated for three years over three different sludge ages. The validity of the model was confirmed with data from the pilot plant. Also, the utility of DESASS as a valuable tool for designing NDEBPR systems was confirmed.


Sign in / Sign up

Export Citation Format

Share Document