Determination of the phytotoxicity of barium in leach-field disposal of gas well brines

1986 ◽  
Vol 92 (2) ◽  
pp. 159-169 ◽  
Author(s):  
M. L. Cipollini ◽  
J. L. Pickering
Keyword(s):  
2008 ◽  
Author(s):  
Qinglong Xu ◽  
Rui Shao ◽  
Shiquan Yu ◽  
Baizhou Fu

2019 ◽  
Vol 141 (10) ◽  
Author(s):  
Alex W. Mwang’ande ◽  
Hualin Liao ◽  
Long Zeng

Annulus pressure buildup (APB) is still a serious problem in offshore gas wells, which threatens the safety of wells for the entire phases of drilling, completion, and production. The existing methods for mitigating APB are technically complex and highly costly. Setting top of cement (TOC) below the outer casing shoe to mitigate APB is easy to implement and can significantly reduce costs. However, there are no unified methods of determining TOC for this purpose. Nevertheless, existing petroleum standards give ambiguous regulations on the setting of TOC. This article brings a new and cheap method of mitigating APB by determining best TOC settings using a mathematical model for calculating APB from both annulus fluid expansion (AFE) and sustained casing pressure (SCP). Field data from gas well X are inputted to the model to describe how it serves this purpose. Calculation results for well X show that setting TOC's above and below the upper casing shoes for production and intermediate casings annuli, respectively, can greatly avoid the problem of APB and the costs associated with the existing mitigation methods. This technique can be used to other wells following the same procedures. The developed model reduced greatly the ambiguity of TOC determination as it helps to get the clear TOC combinations that control APB at the lowest cost of well construction while maintaining good and safe well operation.


2000 ◽  
Author(s):  
Omer Inanc Tureyen ◽  
Abdurrahman Satman ◽  
Mustafa Onur
Keyword(s):  

1963 ◽  
Vol 15 (06) ◽  
pp. 651-658 ◽  
Author(s):  
R.D. Carter ◽  
S.C. Miller
Keyword(s):  

2011 ◽  
Vol 284-286 ◽  
pp. 1049-1052 ◽  
Author(s):  
Zheng Fan ◽  
Wen Hong Li ◽  
Dong Li ◽  
Cun Ju Liu ◽  
Yu Luo ◽  
...  

The ability of IMC-80BH corrosion inhibitor is proven to be excellent in earlier indoor static and flowing evaluation and it is worthwhile to determine the inhibitor concentration to maintain the optimum concentration for the sake of effective gas well protection. A improved concentration determination method is aboratively investigated. The maximum absorption wavelengths, buffer solution, reaction time and additive dosage of chromogenic reagent XD are detected successively and the standard curve of liquid phase behaves better than oil gas. The sample verification demonstrates that such determination measurement is reliable and precise. The four representative gas wells including G8-7, S59, W26-5 and G49-6 in service are also determined. The determination result offered substantial basis to analyze and select appropriate inhibitor injection program and dosage.


2014 ◽  
Vol 1073-1076 ◽  
pp. 592-596
Author(s):  
Pei Luo ◽  
Yu Ming Luo ◽  
Kai Ma ◽  
Biao Zhang ◽  
Sha Sha Song

In the process of high sulfur gas field development, the sulfur will separate out from the mixed gas when the pressure near wellbore area drops to a critical pressure of H2S. This will reduce the reservoir porosity greatly and decrease the gas well productivity as well. This paper discusses the characteristics of pressure transient testing plots when sulfur deposition occurs based on the redial composite reservoir model. And introduce an approach to determine the sulfur deposition radius near the wellbore with pressure transient testing interpretation in high sulfur gas reservoir. The method has been applied in some high sulfur gas field in eastern Sichuan Basin. The result shows that the method is simple and practical.


1972 ◽  
Author(s):  
Hossein Kazemi

Abstract Two simple and equivalent procedures are suggested for improving the calculated average reservoir pressure from pressure buildup tests of liquid or gas wells in developed reservoirs. These procedures are particularly useful in gas well test analysis irrespective of gas composition, in reservoirs with pressure-dependent permeability and porosity, and in oil reservoirs where substantial gas saturation has been developed. Long-term production history need not be known. Introduction For analyzing pressure buildup data with constant flowrate before shut in, two plotting procedures are mostly used: The Miller-Dyes-Hutchinson (MDH) plot (1,8) and the Horner plot (2,8). The Miller-Dyes-Hutchinson plot is a plot of pws vs log Δt. The Horner plot consists of plotting the bottom hole shut-in pressure, pws vs log [(tp + Δt)/Δt]. Δt is the shut-in time and tp is a pseudo-production time equal to the ratio of total produced fluid and the last stabilized flowrate prior to shut in. This method was first used by Theis (3) in the water industry.


Sign in / Sign up

Export Citation Format

Share Document