Comparative experimental study of full-scale H-subframe using a new industrialized building system and monolithic reinforced concrete beam-to-column connection
2012 ◽
Vol 23
(8)
◽
pp. 563-579
◽
Keyword(s):
1963 ◽
Vol 89
(0)
◽
pp. 180
1963 ◽
Vol 82
(0)
◽
pp. 23-28
2010 ◽
Vol 51
(6)
◽
pp. 879-890
◽
2014 ◽
pp. 235-241
◽
Keyword(s):
2018 ◽
Vol 156
◽
pp. 68-81
◽
Keyword(s):
2016 ◽
Vol 8
(6)
◽
pp. 2772-2778
Keyword(s):
2003 ◽
Vol 3
(3)
◽
pp. 83-90
2007 ◽
Vol 72
(621)
◽
pp. 135-140
◽
Keyword(s):