Financially embedded facility location decisions on designing a supply chain structure: A case study
Keyword(s):
2011 ◽
Vol 3
(2)
◽
pp. 218
◽
Keyword(s):
Keyword(s):
2011 ◽
Vol 58-60
◽
pp. 209-214
Keyword(s):
Keyword(s):
Keyword(s):
2013 ◽
Vol 37
(18-19)
◽
pp. 8467-8483
◽
Keyword(s):
2014 ◽
Vol 84
(5)
◽
pp. 639-664
◽