An integrated preventive maintenance and production planning model with sequence-dependent setup costs and times

2017 ◽  
Vol 33 (8) ◽  
pp. 2451-2461 ◽  
Author(s):  
Xuejuan Liu ◽  
Wenbin Wang ◽  
Rui Peng
Sign in / Sign up

Export Citation Format

Share Document