Local and regional photovoltaic power prediction for large scale grid integration: Assessment of a new algorithm for snow detection

2011 ◽  
Vol 20 (6) ◽  
pp. 760-769 ◽  
Author(s):  
Elke Lorenz ◽  
Detlev Heinemann ◽  
Christian Kurz
2019 ◽  
Vol 101 ◽  
pp. 527-547 ◽  
Author(s):  
Peter Kohlhepp ◽  
Hassan Harb ◽  
Henryk Wolisz ◽  
Simon Waczowicz ◽  
Dirk Müller ◽  
...  

2016 ◽  
Vol 839 ◽  
pp. 44-48
Author(s):  
Phairot Phanukan ◽  
Nipon Ketjoy

This article presents the availability of 4 large scale grid connected photovoltaic (PV) power plants that located in Petchaboon, Nakhon Sawan, and Chai Nat province of Thailand. These power plant size are 4.5 MW and 6.5 MW. In addition, they are constructed with the same platform, component, and commercial operation date (COD) in the same year. The data were collected during 1st August 2012 to 31st October 2014. The study result found that availability of these power plant is over 97 % every year except Nakhon Sawan 1 plant in the first year. The internal unavailability trend is quickly reduce while external unavailability is randomly fluctuation.


Sign in / Sign up

Export Citation Format

Share Document