A branch-and-bound algorithm for the time-dependent travelling salesman problem

Networks ◽  
2018 ◽  
Vol 72 (3) ◽  
pp. 382-392 ◽  
Author(s):  
Anna Arigliano ◽  
Tobia Calogiuri ◽  
Gianpaolo Ghiani ◽  
Emanuela Guerriero
Networks ◽  
2012 ◽  
Vol 61 (1) ◽  
pp. 58-75 ◽  
Author(s):  
Francesco Carrabs ◽  
Raffaele Cerulli ◽  
Maria Grazia Speranza

2014 ◽  
Vol 48 (1) ◽  
pp. 46-58 ◽  
Author(s):  
Jean-François Cordeau ◽  
Gianpaolo Ghiani ◽  
Emanuela Guerriero

2013 ◽  
Vol 2013 ◽  
pp. 1-10
Author(s):  
M. Huang ◽  
Huaping Wu ◽  
Vincent Cho ◽  
W. H. Ip ◽  
Xingwei Wang ◽  
...  

The single machine scheduling problem with multi-rate-modifying activities under a time-dependent deterioration to minimize makespan is studied. After examining the characteristics of the problem, a number of properties and a lower bound are proposed. A branch and bound algorithm and a heuristic algorithm are used in the solution, and two special cases are also examined. The computational experiments show that, for the situation with a rate-modifying activity, the proposed branch and bound algorithm can solve situations with 50 jobs within a reasonable time, and the heuristic algorithm can obtain the near-optimal solution with an error percentage less than 0.053 in a very short time. In situations with multi-rate-modifying activities, the proposed branch and bound algorithm can solve the case with 15 jobs within a reasonable time, and the heuristic algorithm can obtain the near-optimal with an error percentage less than 0.070 in a very short time. The branch and bound algorithm and the heuristic algorithm are both shown to be efficient and effective.


Sign in / Sign up

Export Citation Format

Share Document