Streamflow variability in the past four centuries for the largest tributary of the Yellow River and its teleconnection with large‐scale climate forcing

Author(s):  
Guang Bao ◽  
Na Liu ◽  
Maili Wu ◽  
Zhiye Liu
2019 ◽  
Vol 11 (14) ◽  
pp. 3818
Author(s):  
Jun Qiu ◽  
Tie-Jian Li ◽  
Fang-Fang Li

Large-scale reservoirs have played a significant role in meeting various water demands and socio-economic development, while they also lead to undeniable impacts on the environment and ecology. The Longyangxia reservoir located on the Yellow River is the first large-scale reservoir on the upper Yellow River with a control area of 18% of the entire Yellow River Basin. Since it was put into operation in 1987, it has made great contributions to the national economy for over 30 years. In this study, the socio-economic benefits of the Longyangxia reservoir in power generation, water supply, flood control, and ice prevention are investigated. More importantly, its impacts on the ecology and environment are also presented and analyzed, such as the impacts on river morphology, flow regimes, peak flow, fish, phytoplankton, and zooplankton. It can be concluded that the construction of the Longyangxia reservoir contributes greatly to socio-economic benefits, the water area nearby has formed a new ecological environment, and the trophic level of the aquatic environment has probably increased.


2019 ◽  
Vol 2019 ◽  
pp. 1-12 ◽  
Author(s):  
Fei Ye ◽  
Nan Qin ◽  
Xiang Gao ◽  
Xue-yong Quan ◽  
Xian-zhuo Qin ◽  
...  

The Lanzhou Yellow River Tunnel is the first metro shield tunnel that undercrosses the Yellow River in China. It was completed after successfully overcoming several construction challenges, including strata with a high proportion of large-sized sandy cobble stratum being saturated, large-scale sand pits along the bank of the Yellow River, and a combination of boulders and erratic blocks of rock. Given the difficulties in constructing the tunnel, this paper summarizes the scheme employed to transform the cutter and cutter head design to be applicable to sandy cobble stratum and the key technology used to form the slurry film to facilitate crossing the sand pits in a systematic way. The transformation scheme primarily involved the addition of an adjusting device to control the aperture ratio of the shield on the cutter head, a protective device for the hob hub, and a protective device for the piston rod in the oil cylinder of the crusher. The implementation of measures mentioned above guarantees the safe completion of the tunnel, which can provide a reference for similar projects.


Wetlands ◽  
2020 ◽  
Vol 40 (6) ◽  
pp. 2741-2754
Author(s):  
Huijuan Xia ◽  
Lusan Liu ◽  
Junhong Bai ◽  
Weijing Kong ◽  
Kuixuan Lin ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document