Simultaneous nitrogen and phosphorus removal by combined anammox and denitrifying phosphorus removal process

2017 ◽  
Vol 93 (1) ◽  
pp. 94-104 ◽  
Author(s):  
Meijiao Zhang ◽  
Sen Qiao ◽  
Donghai Shao ◽  
Ruofei Jin ◽  
Jiti Zhou
2013 ◽  
Vol 401-403 ◽  
pp. 2084-2087
Author(s):  
Ming Fen Niu ◽  
Si Li ◽  
Hong Jing Jiao ◽  
Jian Wei ◽  
Yuan Yang Sun ◽  
...  

Denitrifying phosphorus removal can be achieved with the same matrix simultaneous nitrogen and phosphorus removal,is a hot topic of abroad study biological wastewater treatment,This is discussed the Influence factors of anoxic tank NO3- load, dissolved oxygen and the volume ratio of aerobic tank and anoxic tank, pH value of wastewater, sludge retention time (SRT), hydraulic retention time (HRT), mixed liquor suspended solids (MLSS) and temperature on denitrifying phosphorus removal, for denitrifying phosphorus removal process simulation, experimental research and practical application provides a reference and basis.


2004 ◽  
Vol 50 (6) ◽  
pp. 179-188
Author(s):  
Y. Huang ◽  
Y. Li ◽  
Y. Pan

An updated biological nitrogen and phosphorus removal process - BICT (Bi-Cyclic Two-Phase) biological process - is proposed and investigated. It is aimed to provide a process configuration and operation mode that has facility and good potential for optimizing operation conditions, especially for enhancing the stability and reliability of the biological nutrient removal process. The proposed system consists of an attached-growth reactor for growing autotrophic nitrifying bacteria, a set of suspended-growth sequencing batch reactors for growing heterotrophic organisms, an anaerobic biological selector and a clarifier. In this paper, the fundamental concept and operation principles of BICT process are described, and the overall performances, major operation parameters and the factors influencing COD, nitrogen and phosphorus removal in the process are also discussed based on the results of extensive laboratory experiments. According to the experimental results with municipal sewage and synthetic wastewater, the process has strong and stable capability for COD removal. Under well controlled conditions, the removal rate of TN can reach over 80% and TP over 90% respectively, and the effluent concentrations of TN and TP can be controlled below 15 mg/L and 1.0 mg/L respectively for municipal wastewater. The improved phosphorus removal has been reached at short SRT, and the recycling flow rate of supernatant between the main reactors and attached-growth reactor is one of the key factors controlling the effect of nitrogen removal.


2013 ◽  
Vol 663 ◽  
pp. 958-963
Author(s):  
Chang Ming Shen ◽  
Dian Hai Yang ◽  
Guo Hua Wang

Nitrogen and phosphorus are the nutrients induced eutrophication, therefore the removal of nitrogen and phosphorus is the main target of domestic wastewater treatment. In order to achieve better nutrient removal effect with lower construction and operation cost, a new nitrogen and phosphorus removal process was developed based on simulation. New process named MUST was developed by mixing UCT and step-feed BNR technology together, and possessed the advantages of two processes. The results of simulation show that MUST can achieve similar treating effect with 20% shorter hydraulic retention time (HRT) compared with UCT process. The influent splitting ratio of 4:3:3 was recommended for MUST operation. A pilot experiment of MUST was also carried out according to simulation results, and achieved very good pollutant remove effect, the average COD, NH4+-N, TN, TP removal efficiency were 85.4%, 94.0%, 65.1%, 62.3% respectively under the condition of low influent COD/TN ratio. Considering the excellent pollutant removal capacity of MUST, an upgrade project chose it as wastewater treatment process. This paper just starts the research of MUST, further study is necessary and valuable.


2013 ◽  
Vol 864-867 ◽  
pp. 1616-1620
Author(s):  
Lin Bo Sun ◽  
Shun Tian ◽  
Wen Juan Chen ◽  
Wei Jian Jia ◽  
Yong Lei Wang

The designed capacity of Jinan Citys wastewater treatment plant (the second sewage treatment plant) is 200,000 m3/d, and the biological treatment process is DE-type oxidation ditch process. Because of self-control requirements, equipment quality and management , alternat-ing operation of anoxia and oxygen can not be achieved. Acting in concert with the engineering of south-to-north water diversion and water quality improvement of the Xiaoqing River, water quality improvement and transformation of nitrogen and phosphorus removal process was condu-cted. By increasing the diversion wall, digestive reflux and other measures, the DE oxidat-ion ditch process was transformed into A2/O process, while the depth of V-efficiency fiber filter processing and chemical phosphorus removal process were increased. After the upgrade, the process is stable, the effluent quality reached an A standard of " discharge standard of pollutants for municipal wastewater treatment plant" (GB18918-2002).


Sign in / Sign up

Export Citation Format

Share Document