Commissioning of abandoned drainage water reuse systems in Egypt: A case study of upgrading the Umoum project, Nile Delta
2014 ◽
Vol 140
(5)
◽
pp. 05014001
◽
Keyword(s):
2008 ◽
Vol 37
(S5)
◽
pp. S-8-S-24
◽
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):