A large-scale field trial of thin-layer capping of PCDD/F-contaminated sediments: Sediment-to-water fluxes up to 5 years post-amendment
2015 ◽
Vol 12
(2)
◽
pp. 216-221
◽
Keyword(s):
2012 ◽
Vol 46
(21)
◽
pp. 12030-12037
◽
Keyword(s):
Keyword(s):
2009 ◽
Vol 157
(7)
◽
pp. 2108-2117
◽
Keyword(s):
Keyword(s):
2007 ◽
Vol 11
(4)
◽
pp. 300-308
◽
2015 ◽
Vol 55
(6)
◽
pp. 1466-1473
◽