A method of economical load dispatch for steam turbine unit of thermal power plant

2008 ◽  
Vol 32 (8) ◽  
pp. 752-764 ◽  
Author(s):  
Jingyu Ran ◽  
Lin Yang ◽  
Li Zhang
2020 ◽  
Vol 67 (11) ◽  
pp. 800-804
Author(s):  
K. E. Aronson ◽  
B. E. Murmansky ◽  
V. B. Novoselov ◽  
Yu. M. Brodov ◽  
A. Yu. Sosnovsky ◽  
...  

2017 ◽  
Vol 148 ◽  
pp. 237-244 ◽  
Author(s):  
G. Madrigal-Espinosa ◽  
G.-L. Osorio-Gordillo ◽  
C.-M. Astorga-Zaragoza ◽  
M. Vázquez-Román ◽  
M. Adam-Medina

2013 ◽  
Vol 694-697 ◽  
pp. 778-781 ◽  
Author(s):  
Li Kun Zheng ◽  
Chang Chen ◽  
Dan Mei Xie ◽  
Heng Liang Zhang

The cold-end system of steam turbine is an important auxiliary system in thermal power plant, its operating mode has a direct impact on the output of the unit and auxiliary power. This paper uses an optimization analysis method to calculate the cold-end system of a 1000MW ultra-supercritical(USC) unit, and establishes a cold-end optimization system by using VB6.0 for a domestic ultra-supercritical unit, which provides an online guide for the operator by calculating the condenser. The results show that this system can provide some guidance for unit operation.