Grid Network Requirements and Driver Applications

Grid Networks ◽  
2006 ◽  
pp. 17-48
Author(s):  
Jason Leigh ◽  
Luc Renambot ◽  
Maxine Brown ◽  
Peter Clarke ◽  
Robert Grossman ◽  
...  
Keyword(s):  
2012 ◽  
Vol 38 (1) ◽  
pp. 32-36
Author(s):  
T. MohanRaj ◽  
S. Shahul Hammed ◽  
Amala Deepan

2021 ◽  
Vol 336 ◽  
pp. 05020
Author(s):  
Piotr Hadaj ◽  
Marek Nowak ◽  
Dominik Strzałka

A case study based on the real data obtained from the Polish PSE System Operator of the highest voltages electrical energy network is shown. The data about the interconnection exchange and some complex networks (graphs) parameters were examined, after the removal of selected nodes. This allowed to test selected network parameters and to show that the breakdown of only three nodes in this network can cause significant drop of its average efficiency.


Sign in / Sign up

Export Citation Format

Share Document